Skip to content
Permit drawings

Dock permit drawings, straight from your dock plan

The dock you drew becomes a scaled plan, a profile with high and low water, an aerial and a vicinity map: the set most permit offices ask for.
  • PDF export with a free account
  • Letter, legal, tabloid or A3
  • Any dock brand or wood
Proposal Builder · plan viewP-3
The plan view on a permit-style page in Dock Builder’s Proposal Builder: the dimensioned L-shaped dock between two lot lines (97 ft each), with shore, high-water (OHW) and low-water (OLW) lines, setbacks of 41.2 and 48.75 ft, an offshore distance of 67.25 ft, a depth line with soundings of 0′, 3′, 5′ and 7′, and a north arrow.

The pages a permit set is built from

Project ▸ Export PDF opens the Proposal Builder. Checklists most often ask for a plan view, a cross-section and a vicinity map[1]; the first three sheets cover them.
The plan view page: the dimensioned dock between two lot lines, with shore, high and low water, setbacks of 41.2 and 48.75 ft, a depth line and a north arrow.
A-1Plan view
Dimensions, lot lines, water lines, setbacks.
The profile view: the lakebed from depth soundings, high water at 0 ft and low water at −2 ft, the floats and gangway, and a scale bar.
A-2Profile
The cross-section, from your depth soundings.
A Site & aerial page: the dock and site lines on satellite imagery, a vicinity street map with a pin, a north arrow, a scale bar of about 1:376 and a legend naming each line.
A-3Site & aerial
Aerial, vicinity map, scale bar and legend.
The 3D view: the L-shaped dock and gangway over water, seen from an orbit camera.
A-43D view
Snapshots of what will be built.
Paper
Letter, legal, tabloid or A3, portrait or landscape.
Scale
Lock a plan to 1:10–1:200 or fit it. The scale bar reads true either way.
Contacts
Applicant, engineer of record and your company.
Notes, images, signature
Upload a survey image. Add a block for a printed signature.

A project can hold several documents: keep the priced proposal for the customer and a permit set without prices.

One model

Every page reads the same drawing

Draw the site and the dock once. The pages measure from that model; nothing to trace or redraw.
  • Section sizes become the dimensions.
  • Property, water and setback lines print, and the legend names them.
  • Soundings become the lakebed on the profile.
  • The site location places the aerial and vicinity map.
  • Applicant and engineer come from the contacts.
Editor · Lakeside L-Dock (demo)Model
The editor with the L-shaped dock on a satellite view: Shore, OHW and OLW lines, two lot lines, a depth line with soundings of 0′, 3′, 5′ and 7′, setbacks of 41.2 and 48.75 ft and an offshore distance of 67.25 ft.
Site markup

Draw the lines a reviewer checks

Reviewers want distances to each property line, to neighboring docks and to the channel; Lake of the Ozarks asks for all three[3]. Draw them as markup lines and they print on the right pages.
Markup lines and where they print
  • Property boundary
    What it shows
    Side lot lines, extended into the water.
    Prints on
    Dock view, aerial view
  • Shoreline
    What it shows
    Where land meets water; places the bank on the profile.
    Prints on
    Dock view, aerial view, profile view
  • High water (OHW)
    What it shows
    Ordinary high water; the 0.0′ datum.
    Prints on
    Dock view, aerial view, profile view
  • Low water (OLW)
    What it shows
    Ordinary low water, below the datum.
    Prints on
    Dock view, aerial view, profile view
  • Setback line
    What it shows
    The no-build line inside each property line.
    Prints on
    Dock view, aerial view
  • Depth line
    What it shows
    Soundings that become the lakebed on the profile.
    Prints on
    Profile view, dock view
  • Measurement
    What it shows
    Any distance: a property line, a neighbor’s dock, the channel.
    Prints on
    Dock view, aerial view

Some authorities cap the area of a dock rather than its length — Florida’s exemption is written in square feet of over-water surface[4], and TVA limits a residential facility’s footprint to 1,000 square feet[5]. The take-off totals deck area; Dock Builder doesn’t compute area over the water, so work that out from your high-water line. See how to draw a dock plan for a permit.

Profile view

A cross-section built from your depth soundings

Profile viewP-3
Dock Builder’s profile view: the shore bank, high water at 0 ft and low water at −2 ft, the lakebed drawn from six soundings, the gangway and floats with 1.3 ft of freeboard, 8.6 ft of water at the end, a distance scale from high water and a legend noting 1:124 horizontal with 2.7× vertical exaggeration.
A real profile from a demo project: soundings of 0′, 3′, 5′ and 7′ along a 66.5 ft depth line.

Draw a depth line out along the dock and type the depth at each point. The profile projects your dock onto it: deck, floats or pilings, the gangway, the bank and the lakebed.

High water is the 0.0′ datum; low water sits below it. The vertical axis is exaggerated so shallow water reads on paper, and the factor is printed. Duke Energy lists a “plan & profile” drawing among its application documents[2].

Before you submit

Requirements vary. Here’s how to use the set.

  1. Find out who reviews your dock

    The Army Corps, a state agency, a lake utility, your county, or several. See our dock permit guide.
  2. Get their checklist and match the paper

    Several ask for 8.5×11″ copies[1,3]; pick letter or tabloid to match.
  3. Draw the site, then the dock

    Place the project on the aerial, add the site lines, then the dock. See site & aerial map.
  4. Add the contacts, build the pages and export

    Add contacts, lay out the pages, lock the plan to a scale and download. The PDF export guide has each setting.
FAQ

Permit drawing questions

Are these drawings “permit-ready”?

They are the drawing set most permit offices ask for — a scaled plan, a cross-section with water levels, an aerial site view and a vicinity map. Requirements vary by authority, and nobody can promise an approval. Get your office’s checklist first, then compare it against the set. Our dock permit guide explains who issues permits and what they usually want.

Do I need an account?

Not to draw. The designer is free with no account, aerial map included. Exporting the PDF set and filling in the applicant details need a free account — just an email address.

What scale are the drawings?

Lock a plan view to a fixed scale from 1:10 to 1:200, or let it fit its frame on the page. Put a scale bar beside it and the bar reports the real ratio either way; a graphic scale stays correct if the page is printed smaller. If your office asks for a specific engineering scale such as 1″ = 20′ (1:240), check it against these options before you submit.

Can an engineer stamp the drawings?

Yes. Add the engineer of record — name, firm and license number — under Settings ▸ Contacts, then place a contact element for them on the drawing pages. The engineer reviews the design and seals the set; Dock Builder produces drawings, not engineering.

Can I add a survey or parcel map I already have?

Yes. Add an image element to a page and upload the survey or parcel map as a PNG or JPEG; give it a page of its own and it prints with the rest of the set.

For dock builders

Draw it once. Print the permit set.

Lay out the dock on the aerial free, no account. A free account exports the PDF set.

Sources

  1. 1.Washington Office of Regulatory Innovation and Assistance — JARPA Instruction A — site maps and drawings (rev. 08/24, PDF) (accessed Oct 2026)
  2. 2.Duke Energy — Lake use permitting — FAQs. Lists registered surveys, a plan & profile drawing and county/local building permits among the documents an application needs (accessed Oct 2026)
  3. 3.Ameren Missouri — Lake of the Ozarks permitting (accessed Oct 2026)
  4. 4.Florida DEP — Dock permitting in Florida (Northeast District handout, PDF) (accessed Oct 2026)
  5. 5.Tennessee Valley Authority — Section 26a guidance — water-use facility dimensions and roof overhangs (accessed Oct 2026)

Examples of what permit authorities ask for, checked October 2026. Rules change — always use your authority’s current checklist. Not legal advice.